Drainage matters in Bray as it does everywhere in Ireland. Tar and chip is not fully permeable, so where a drive falls towards the house we install a channel drain or soakaway within the boundary to satisfy the planning exemption condition. We design the falls and drainage as part of the site assessment, not as an afterthought.
Why Bray homes choose us for tar and chip
The aggregate we specify for Bray jobs is chosen to suit the local landscape and the property type. For rural and semi-rural frontages, natural grey limestone or brown quartzite in 14mm gives a coarser, more traditional texture; for suburban driveways, 10mm charcoal or golden flint chip produces a tighter, more refined finish. Blended two-colour aggregates are increasingly popular because they give a more natural, varied appearance than a single stone.
The base determines whether a tar and chip driveway lasts ten years or thirty. Every job we build in Bray starts with excavation to formation, a geotextile separation membrane, and at least 150mm of compacted Clause 804 hardcore. Where an existing tarmac or concrete base is sound and at the right level, we can apply the surface dressing directly — saving you the base cost without compromising the result.
Local knowledge: working in Bray
Bray's geology is varied and it matters for driveway construction. The seafront roads and lower town sit on relatively soft ground with a high water table in places — we always check drainage carefully before specifying a base depth, and on the lower-lying roads we often recommend a deeper build-up or a French drain to the rear of the driveway. The hillside estates off Killarney Road and Boghall Road sit on firmer ground but have steeper gradients that require careful fall design to prevent water sheeting towards the house.
How the job runs
A standard tar and chip driveway in Bray takes two to three working days: base preparation and any drainage work on day one, bitumen application and chip rolling on day two, then a final sweep and inspection before handover. The surface needs 24–48 hours to cure fully before normal traffic, and a small amount of loose chip in the first week is normal as the binder sets.
Every job in Bray is measured on site before we quote. The written specification states the base build-up, the aggregate type and size, and whether the price is for a surface dressing or a full build — so you can compare our price against any other quote on equal terms.